HEAT PUMP GELBI SUNEX

PROJECT INFO

Exeon was responsible for the design and construction of the heat pump casing, achieving rigorous requirements for both manufacturing costs and production technologies.

SERVICE PROVIDED

  • research
  • ideation
  • concept creation
  • industrial design
  • digital mock-up creation
  • physical mock-up creation
  • conceptual engineering
  • technical development
  • detail engineering

END CUSTOMER